东北50岁熟女叫床有谁没谁了,被多个强壮的黑人灌满精,野花免费观看 ,久久国产精品只做精品,亚洲女精品一区二区三区,日韩一区二区三区在线,日韩欧美国产视频

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
Standard for Regular Explosion Prevention Testing Reports in Hazardous Chemical Places

SINO Testing Services

| 2024-03-22|Return

The on-site explosion-proof testing we often refer to is the regular inspection of electrical equipment used in explosive hazardous areas to ensure its explosion-proof safety performance.


According to the AQ3009-2007 Electrical Safety and Explosion Protection Code for Hazardous Areas, the regular inspection period for such places generally cannot exceed 3 years.


The inspection items include the selection and installation of explosion-proof equipment, line laying, static electricity, grounding, etc.


The inspection methods include visual inspection, general inspection, and detailed inspection, and some sites may also involve shutdown inspections.


After inspection, if there are any non conformities, we will provide specific rectification suggestions to the owner, and the owner can make rectification within a specified period based on the non conformities.


Zhongnuo Testing has provided on-site explosion-proof testing and explosion-proof renovation construction services for various gas stations, gas stations, oil depots, food factories, feed factories, chemical plants, etc., with a large number of successful cases and industry experience.


If you happen to need to do such on-site explosion-proof electrical testing reports, please feel free to send us a private message for specific communication.




Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發(fā)消息 1354407946
點擊這里給我發(fā)消息 1354407946